Complete gearbox failure halted production line operations. Critical wear of gears and shafts, along with damaged internal components. Procurement of a new unit would require 6+ months of lead time, resulting in significant production losses.
planetary gearbox emergency overhaul
In service for 3 months at the client’s site, delivering stable, reliable operation.
Complete disassembly and full remanufacture of shafts, gears, and internal components, including precision bearing installation, dynamic balancing, and load testing to validate performance.
5-week restoration
Challenge
Comprehensive warranty coverage
20% cost avoidance vs. new equipment
FORT Solution
Emergency Blower Turnaround
Standard industry repair time: 6-8 weeks.
Severe wear of air compressor components caused critical downtime in a water treatment facility.
FORT Solution
20-day record turnaround
Challenge
Shutdown cost avoided
Production continuity maintained